roadmap
Roadmap
A phased, milestone-based timeline covering the 12-week intended implementation window.
# Roadmap — 67 Hunter Street, Euroa > Lorem ipsum. Stub document body; the real version is generated by the > orchestrator Worker and stored in R2. ## Phase 1 — Interior preparation (Weeks 1–2) - Living room paint and lighting. - Kitchen splashback demo and replaster. - Bathroom tapware order confirmation. ## Phase 2 — Interior fit-out (Weeks 3–4) - Kitchen cabinet repaint and tapware install. - Bathroom mirror and storage install. - Bedroom soft furnishings. ## Phase 3 — Exterior (Weeks 5–6) - Fence repaint (single scaffold hire). - North strip lawn refresh and rosemary edging. - Mailbox and feature tree. ## Phase 4 — Snag and hand-off (Week 6) - Final photographs and verifier log. - Walk-through with owners. - All documentation left on site. ## Milestones | Milestone | Target week | | --- | --- | | Materials on site | End of week 0 | | Interior complete | End of week 4 | | Exterior complete | End of week 5 | | Hand-off | End of week 6 |