resources
Resources plan
Combined materials bill of quantities, supplier list, and lead-time notes.
# Resources plan — 67 Hunter Street, Euroa > Lorem ipsum. Stub document body; the real version is generated by the > orchestrator Worker and stored in R2. This stub combines the materials > BOM and the trade schedule into a single plan, per the architecture > spec's note that the Q3=C list had 8 named docs (not 10). ## Materials (quantities, supplier, lead time) | Item | Quantity | Supplier | Lead time | | --- | --- | --- | --- | | Warm-white wall paint | 30 L | Local | 1 day | | Soft-charcoal exterior paint | 12 L | Local | 1 day | | Brushed brass kitchen tap | 1 | National | 3 weeks | | Brushed brass bathroom tapware set | 1 | National | 3 weeks | | Terracotta mosaic splashback | 4 m² | Specialist | 2 weeks | | Jute rug, 3 x 4 m | 1 | National | 1 week | | Linen drapes, oatmeal | 4 m | Local | 1 week | | Rattan headboard, queen | 1 | National | 2 weeks | | Crepe myrtle, advanced | 1 | Local nursery | 1 week | | Native grass seed mix | 2 kg | Local | 1 day | ## Trade schedule | Trade | When | Notes | | --- | --- | --- | | Painter | Weeks 1, 5 | Interior first, exterior with scaffold. | | Tiler | Week 2 | One-day splashback. | | Plumber | Week 3 | Tapware swap, basin and shower. | | Gardener | Week 5 | Strip refresh and feature tree. |