Renovation proposal 67 Hunter Street, Euroa

resources

Resources plan

Combined materials bill of quantities, supplier list, and lead-time notes.

# Resources plan — 67 Hunter Street, Euroa

> Lorem ipsum. Stub document body; the real version is generated by the
> orchestrator Worker and stored in R2. This stub combines the materials
> BOM and the trade schedule into a single plan, per the architecture
> spec's note that the Q3=C list had 8 named docs (not 10).

## Materials (quantities, supplier, lead time)

| Item | Quantity | Supplier | Lead time |
| --- | --- | --- | --- |
| Warm-white wall paint | 30 L | Local | 1 day |
| Soft-charcoal exterior paint | 12 L | Local | 1 day |
| Brushed brass kitchen tap | 1 | National | 3 weeks |
| Brushed brass bathroom tapware set | 1 | National | 3 weeks |
| Terracotta mosaic splashback | 4 m² | Specialist | 2 weeks |
| Jute rug, 3 x 4 m | 1 | National | 1 week |
| Linen drapes, oatmeal | 4 m | Local | 1 week |
| Rattan headboard, queen | 1 | National | 2 weeks |
| Crepe myrtle, advanced | 1 | Local nursery | 1 week |
| Native grass seed mix | 2 kg | Local | 1 day |

## Trade schedule

| Trade | When | Notes |
| --- | --- | --- |
| Painter | Weeks 1, 5 | Interior first, exterior with scaffold. |
| Tiler | Week 2 | One-day splashback. |
| Plumber | Week 3 | Tapware swap, basin and shower. |
| Gardener | Week 5 | Strip refresh and feature tree. |