Renovation proposal 67 Hunter Street, Euroa

build_plan

Build plan

Scope, sequence, dependencies, and hand-off for the proposed work at 67 Hunter Street, Euroa.

# Build plan — 67 Hunter Street, Euroa

> Lorem ipsum. This is a stub document body. The real version is generated
> by the orchestrator Worker from the accumulated per-room assessments and
> stored in R2 at `documents/build-plan.md` and `documents/build-plan.pdf`.

## Scope

The proposed work covers light renovation only: paint, flooring, soft
furnishings, fixtures, tapware, light fittings, cabinet hardware, and
soft landscaping. No structural, plumbing rough-in, or electrical rough-in
work is in scope. All suggestions are within the Victorian
no-planning-permit envelope.

## Sequence

1. **Week 1** — Living areas first: paint, lighting, soft furnishings.
2. **Week 2–3** — Kitchen and bathroom fixtures and tapware.
3. **Week 4** — Bedrooms and entry.
4. **Week 5** — External: fence paint, lawn refresh, plantings.
5. **Week 6** — Snagging, hand-off, photograph final state.

## Dependencies

- Tapware delivery (3-week lead time, ordered Week 0).
- Splashback tiler availability (booked 2 weeks in advance).
- Painter sequencing — interior must precede exterior to keep a single
  scaffold hire.

## Risks

See the risk register document. The two highest-rated items are weather
delay to exterior painting and the risk of the splashback substrate
requiring minor replastering once the existing tile is removed.

## Hand-off

- One in-person walk-through at snag.
- PDF proposal, this build plan, and the resources plan left in the kitchen
  drawer.
- All supplier receipts and warranty cards collated into a single A4
  envelope.